1252 Waste Water Inlet & Outlet Pipe Laying (2006)

This job was located at the Wanganui Airport, working through the runway under pressure of tight time constraints. Laying 1500 meters of 1254mm OD concrete lined steel sewer, and a 650mm diameter NB concrete lined steel sewer falling main. This project was completed in 4 months