© 2023 by SMcCadd Design. All Rights Reserved

  • Facebook - Grey Circle
  • LinkedIn - Grey Circle

1270 Bastia Hill (2006)

Laying of a large storm water line ranging from 1050mm to 1350mm with concrete pipes. As well as laying a sewer line 150mm PVC, various manholes, connections, sumps and associated works. Project was for the Wellington District Council and was completed in 2 months.

1/1